Every project stamped "Executed by DCK." From Texas to the Caribbean. Engineering-grade results.
Large-scale master-planned community. Full infrastructure installation: roads, utilities, drainage systems. Site preparation for 1600 acres. Ongoing execution.

Mission-critical data center. 50MW capacity. Redundant power systems, precision cooling, security infrastructure. Zero downtime tolerance. Delivered on specification.

Expansion facility. 75MW capacity. Advanced cooling systems, fiber connectivity, backup generation. Modular construction methodology. 40% faster than conventional build.

Final phase completion. 100MW total campus capacity. Integrated campus management systems. Full redundancy across all three facilities. Engineering-grade execution throughout.

Island-wide power generation facility. 25MW capacity. Fuel storage, generation equipment, distribution infrastructure. Critical utility execution. Operational since 2023.

Last 40 contracts. Full transparency on execution pipeline.
Showing 10 of 40 recent contracts. VIEW FULL TIMELINE